I-435: Bridge replacement over 87th Street. MO 7: Pavement resurfacing from Pink Hill Road to Victor Road. MO 7: Pavement resurfacing from Route 24 to Pink Hill Road. MO 291: Pavement resurfacing from Route 78 to 39th Street. I-49: Replace sign truss near Longview Road and Blue Ridge Blvd. 24: Pavement resurfacing, guardrail upgrades and adding rumble strips from MO Route 7 to Route 224 near Napoleon. 24: Add intersection turn lane and bicycle/pedestrian facilities from River Blvd. 24: Add turn lanes, improve signage, upgrade pedestrian facilities to comply with the ADA Transition Plan, upgrade drainage, replace signals, and access management from Sterling Avenue to River Blvd. Pittman Road: Drainage upgrade from 41st Street to 42nd Street Prospect Ave.: Bridge replacement over I-70, 0.1 mile south of 13th Street and 0.1 mile north of Truman Road. MO 350: Pavement resurfacing from 63rd Street to 0.7 mile west of Colbern Road. MO 350: Add turn lanes, pedestrian crosswalks, and signals from Laurel Avenue to Westridge Road. US 24: Bridge rehabilitation near Buckner (2021)īlue Ridge Blvd.: Bridge replacement over I-70 in Independence. Area Engineer: Jill 169: Buck O'Neil Bridge Replacement Design/Build Project
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |